Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523Before you sign, your quote should specify slab thickness, base material and depth, concrete strength in psi, whether the mix is air-entrained, reinforcement type and placement, the joint layout and spacing, the finish, and the curing method and duration. On pour day, watch three things: that nothing is placed on frozen or unprepared subgrade, that finishing does not happen while bleed water is standing, and that joints are cut on time.
Quote stage. Thickness in inches. Base material and compacted depth. Mix: psi, air-entrained yes/no, target slump. Reinforcement: type, spacing, how it will be held at the right height, and cover. Joint plan: spacing and depth. Finish: broom, trowel, exposed aggregate, stamped pattern and colors. Curing: method and number of days. Demolition and haul-away: included or not. Who pulls permits. Payment schedule and what triggers final payment.
Pour day. Subgrade clear of topsoil, snow and ice, compacted and sloped. Forms braced. Delivery ticket matches the quoted mix — ask for a copy. Note if water is added at the truck. Screeding followed promptly by bull floating. No further finishing while bleed water is on the surface. Curing started as soon as finishing is complete.
Joint day. Conventional sawcuts within 4 to 12 hours of finishing, or early-entry cuts 1 to 4 hours out. Depth at least a quarter of the slab thickness and no less than an inch. Spacing no wider than 24 to 36 times thickness, capped at 15 feet. Isolation joints at walls, footings, steps, and where the driveway meets walks or curbs.
Sign-off. Photograph the whole slab dated. Confirm curing ran the full 3 to 7 days. Confirm drainage — no ponding after a hose test. Get the written workmanship warranty, the permit and inspection paperwork, and the delivery tickets. Then hold your usage timeline: 24 hours to walk, 3 days for bikes, 7 days to drive, 28 days for heavy vehicles.