EV charging research
The useful primary sources are three. DOE's AFDC publishes charging speeds by level (Level 1 about 5 miles of range per hour, Level 2 about 25) and equipment costs (residential Level 2 hardware cited at $380 to $690, installation about $1,300 per connector). ENERGY STAR publishes charging rate and efficiency figures. The IRS publishes the federal credit terms.
Charging speed (DOE AFDC). AC Level 1 runs on a 120-volt plug at about 1.9 kW, roughly 5 miles of range per hour. AC Level 2 runs on 240 V (or 208 V) at 7.2 to 19.2 kW, roughly 25 miles of range per hour, with residential units commonly up to 30 amps delivering 7.2 kW. DC fast charging goes up to 500 kW and delivers roughly 100 to 200-plus miles in 30 minutes.
Charging speed (ENERGY STAR). Slightly more conservative: Level 1 at 2 to 5 miles of range per hour and Level 2 at 10 to 20, with units wired to 50 amps charging faster. ENERGY STAR also states Level 2 is on average about 10 percent more efficient than Level 1 while adding roughly four times the miles per hour. Where two federal sources give different ranges, treat the spread as the honest answer.
Equipment and installation cost (DOE). DOE cites a Rocky Mountain Institute figure of $380 to $690 for a residential Level 2 charger and $0 to $900 for residential Level 1. National-lab research cited by DOE puts residential installation at $400 to $600 per connector for Level 1 and about $1,300 per connector for Level 2, excluding labor and permitting, and notes labor is the largest single expense in a typical installation.
Running cost (DOE). AFDC's worked example: at 10.7 cents per kWh with a vehicle consuming 27 kWh per 100 miles, cost per mile is about $0.03, and fully charging a 200-mile EV with a 54 kWh battery costs about $6. AFDC also notes actual residential cost depends on equipment, time of day and duration, and that some utilities offer time-of-use rates.
Choosing EV Chargers what the data says
The judgement calls that decide the bill, before anyone quotes you.
- Prefer .gov ranges over vendor single figures AFDC and ENERGY STAR publish ranges because the honest answer is a range. A vendor quoting one number is simplifying to sell.
- Note when two federal sources disagree AFDC says about 25 miles per hour for Level 2; ENERGY STAR says 10 to 20. Both are official. Plan on the low end.
- Separate equipment cost from installed cost DOE's $380-$690 hardware figure excludes labor and permitting. Comparing it to a $959 installed average is apples to oranges.
- Recompute the running cost at your own rate AFDC's 3 cents per mile assumes 10.7 cents per kWh. Substitute your actual rate - the difference across the country is large.
- Check the date on any incentive figure The IRS publishes the exact placed-in-service window for the federal credit. Incentive claims without dates are unreliable.
All EV Chargers research
EV Adoption Metro Benchmarks
EV Charger Install Cost Index
Panel Upgrade Attachment Rate Report
EV Rebate Coverage Map
Utility Interconnection Friction Index
Home EV Charging Demand Index
Where these figures come from
Sources last checked
- U.S. DOE Alternative Fuels Data Center - Electric Vehicle Charging Stations · retrieved 2026-07-26
- U.S. DOE Alternative Fuels Data Center - Charging Infrastructure Development · retrieved 2026-07-26
- U.S. DOE Alternative Fuels Data Center - Charging Electric Vehicles at Home · retrieved 2026-07-26
- ENERGY STAR - Electric Vehicle Chargers · retrieved 2026-07-26