HomeMatchup
Flooring · Checklists

Flooring checklists

A complete flooring quote names the exact product and dye lot, the square footage and waste allowance, tear-out and disposal, a written subfloor repair rate, underlayment or vapor barrier, trim and transitions, stairs priced per step, and the payment schedule. Anything missing from that list is a change order waiting to happen.

Quote checklist. Product name, color and thickness. Square footage measured, not estimated. Waste allowance. Tear-out and haul-away — expect roughly $1–$6 per square foot. A stated per-square-foot rate for subfloor repair if damage is found. Underlayment or vapor barrier. Baseboard and shoe molding by linear foot. Transition strips and thresholds by count. Stairs priced per step. Start date, duration, and payment schedule.

Vetting checklist. Confirm the license status your state requires — requirements differ by state, so check with your own state contractor board rather than taking a contractor's word. Ask for a current certificate of general liability and workers' compensation insurance sent directly from the insurer. Ask who is physically installing, and whether they are employees or subcontractors. Ask for two references from jobs completed more than a year ago, not last month.

Before demolition. Get moisture readings recorded. Photograph the room, the walls and any existing damage. Confirm furniture and appliance handling. Agree on where debris goes and who pays for the dumpster. Ask what happens if asbestos-containing vinyl or mold is discovered — abatement runs about $5–$20 per square foot and mold remediation $10–$25.

Punch list. Sight down every run in daylight for high spots, gaps and lippage. Check the expansion gap at walls behind the baseboard. Open and close every door. Check every transition. Check stair nosings. Confirm the finish is even under raking light. Only then release the balance.

How to choose

Ask for exclusions in writing
The list of what is not included tells you more about the final bill than the list of what is.
Verify insurance with the insurer, not the contractor
Certificates are easy to fake and easy to let lapse. Ask for it to be sent to you directly.
Never pay more than a modest deposit up front
Material deposits are normal. A demand for most of the money before work starts is not.
Do the walkthrough in daylight
Overhead light hides lippage and finish flaws. Low-angle daylight shows everything.
Keep leftover material and the labels
The boxes carry the dye lot and product codes. Both matter for repairs and warranty claims.
0 of 4 live

All flooring checklists

Flooring Buyer Checklist

Flooring Planning Checklist

Flooring Contractor Vetting Checklist

Flooring Shopping List Template

FAQ

Flooring checklists — common questions

Still have a question? Talk to our team →

Product and color, measured square footage plus waste, tear-out and disposal, a subfloor repair rate, underlayment, trim and transitions, stairs per step, schedule and payment terms.
It depends entirely on your state and sometimes your city. Check your state contractor licensing board directly — do not rely on what the contractor tells you.
Enough to cover material ordering. Be skeptical of anyone who wants most of the contract value before the first day of work.
Stop. Vinyl floor tiles, sheet vinyl backing and adhesives are among the materials that can contain asbestos, and fibers are released when the material is disturbed. Abatement runs roughly $5–$20 per square foot and is a licensed specialty, not a flooring crew's job.
Sources

Where these figures come from

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few flooring pros whose licence and insurance we have already checked — free, no obligation.

Get matched free

Free · No pressure · We never sell your details

(866) 582-8523 Get my free quote