Kitchen remodel checklists

Use three checklists: before you hire (verify license and insurance, define scope and exclusions, set a contingency), before demolition (cabinets ordered, appliances locked, permits pulled, temporary kitchen set up), and before final payment (punch list, inspections signed off, warranties and manuals collected).

Before hiring. Verify the contractor's license directly with your state board and get insurance certificates emailed by the insurer, not the contractor. Have a written scope with an explicit exclusions list. Have three itemized bids on identical selections. Have a contingency reserve set aside. Have a payment schedule tied to milestones, not dates.

Before demolition. Cabinets ordered and lead time confirmed in writing. Appliance model numbers final and rough-in specs handed to the installer. Permits pulled by the contractor and posted. All selections made and delivered or scheduled. Temporary kitchen set up somewhere else in the house. Photos taken of the existing space.

During the job. Photograph open walls before they close, with a tape measure in frame. Keep every change order in writing with its price and schedule impact. Do not pay ahead of completed work. Note punch-list items as you spot them rather than trying to remember them at the end.

Before the final payment. Every inspection signed off. Every appliance run through a full cycle, including the dishwasher and the ice maker. Every drawer and door opened, closed, and checked for alignment. Under-sink connections checked dry after running water. All warranty documents, manuals, model numbers, and touch-up paint collected. Punch list closed. Then pay.

How to choose

Verify license and insurance at the source
State licensing board website for the license; certificate emailed by the insurance agency for the coverage. Photos of cards prove nothing.
Write the exclusions list, not just the inclusions
Ask each bidder in writing what is not included. That list is where change orders are born.
Order before you demolish
Cabinet lead times run whether or not the old kitchen is out. Never lose weeks living without a kitchen for no reason.
Run every appliance before final payment
Full dishwasher cycle, ice maker, every burner, the oven, the disposer, the vent. Problems found before the last check are fixed; problems found after are negotiated.
Collect the paperwork on the last day
Manuals, model numbers, warranty documents, care instructions, signed inspection cards, and touch-up paint. Scan it all into one folder immediately.
0 of 4 live

All kitchen remodeling checklists

Kitchen Remodeling Buyer Checklist

Kitchen Remodeling Planning Checklist

Kitchen Remodeling Contractor Vetting Checklist

Kitchen Remodeling Shopping List Template

FAQ

Kitchen Remodeling checklists — common questions

Still have a question? Talk to our team →

Cabinet door and drawer alignment, caulk lines, paint touch-ups, appliance operation, undersink leak check after running water, hardware tightness, and any damage to floors or walls from the work.
Enough to matter. A final retainage held until the punch list is closed is the only real leverage you have to get the last details finished.
Signed inspection cards, all product warranty documents and registrations, appliance manuals and model numbers, countertop care instructions, the final invoice, and lien releases where your state uses them.

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few kitchen remodeling pros whose licence and insurance we have already checked — free, no obligation.

Get matched free

Free · No pressure · We never sell your details

(866) 582-8523 Get my free quote