Permanent in both directions — this one does not come back out

A poured ramp asks nothing of you afterwards, will outlast every other option, and is the only one where a mistake is genuinely hard to undo. Removing it later means a machine, a skip and a bill. That is not a reason to avoid it; it is a reason to be certain about the entrance, the geometry and the drainage before anyone orders concrete.

In short

What is concrete ramp construction?

A concrete ramp is a slab poured in place on a prepared base, usually with integral kerbs or walls and with handrails set into or bolted onto the finished structure. It is the most durable option available and effectively maintenance-free in normal use. Its distinguishing property, and the one that governs every decision around it, is that it is permanent — undoing it is demolition. Get the entrance, the geometry, the surface finish and the drainage settled before the pour, because afterwards there is no adjusting any of them.

Triggers

Signs you need concrete ramp construction

Seeing something not on this list? Browse wheelchair ramps problems by symptom →

The job

How concrete ramp construction actually works

  1. Fix the geometry before anything is dug

    Slope, landing sizes, width, kerbs and handrails come from published accessibility standards and your local code, and on a poured structure they are locked in permanently. This is the moment to have the design drawn and checked, not sketched on the back of the quote.

    Watch for: A contractor who forms it up by eye. Concrete does not forgive an approximate slope, and a ramp poured a little too steep is a permanent problem.

  2. Locate everything buried before excavation

    Utility locates, plus the things that are not on any map: the septic field and its tank lid, the sprinkler lines, the sump discharge, and where the downspouts currently run to. A ramp poured over a septic access lid is a problem that surfaces at the worst possible time.

    Watch for: Digging with no locate having been called. It is a legal requirement in most places and the consequence of skipping it can be catastrophic.

  3. Prepare and compact the subgrade — this is the whole job

    Topsoil and organic material removed, the base built up in compacted layers of the right aggregate, and the depth of the base set for your soil and your frost conditions. Nearly every failed concrete flatwork job is a subgrade job, not a concrete job.

    Watch for: A base thrown in and rolled over once with the plate compactor. Poor compaction is invisible for a year and then shows as a crack and a step at exactly the wrong place.

  4. Form, reinforce, and design where it will crack

    Forms set to the design slope, reinforcement placed at the correct height in the slab rather than lying on the subgrade, and control joints planned so that the inevitable shrinkage cracking happens along a line you chose. Concrete cracks; the craft is deciding where.

    Watch for: Reinforcing mesh left flat on the ground and concrete poured over it. It does nothing there, and it is the most common shortcut in residential flatwork.

  5. Slope the surface so water leaves the house

    The ramp meets the building at the top, which is the last place you want water pooling. The surface needs a fall that carries water away from the foundation, and any cross-fall has to stay gentle enough not to pull a chair sideways.

    Watch for: A ramp that drains back toward the siding or into the crawl space vent. You have then built a very durable structure whose main function is to deliver water to your foundation.

  6. Finish for grip, not for looks

    A steel-trowelled smooth finish is a beautiful indoor floor and a hazardous outdoor ramp. A broom finish, drawn across the direction of travel, is the standard grippy finish and is what you should expect. Discuss it before the pour, because it is decided in the twenty minutes the crew is finishing the slab.

    Watch for: A slick trowelled finish because it photographs better. This cannot be fixed afterwards without grinding or an applied coating, and both are compromises.

  7. Cure it properly, and stay off it

    Concrete gains strength over time under controlled moisture, and how it is cured has a large effect on how well the surface resists scaling later. Nobody uses the ramp until the contractor says so.

    Watch for: A crew who pour on a Friday and tell you it is ready Saturday. Rushing early use, especially in hot or freezing weather, damages the surface permanently.

  8. Agree the winter regime before the first frost

    New concrete is at its most vulnerable to freeze-thaw scaling and to de-icing chemicals in its first season, and some de-icers are hard on concrete at any age. Ask what the contractor recommends for clearing this ramp, and whether the surface should be sealed.

    Watch for: Reaching for the same de-icer used on the driveway. Surface scaling on a ramp is not just cosmetic — a pitted, spalled surface holds water and ice.

Money

What does concrete ramp construction cost?

Concrete generally sits at the top of the range on day one, because most of the money goes into excavation, base preparation, forming and reinforcement rather than into the concrete itself. It then costs essentially nothing to own. The Cost Guide sets out ranges by material and configuration.

See the full concrete ramp construction cost guide — by material, size and region →

Straight answer

When concrete ramp construction is the wrong call

Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.

Your options

Types of concrete ramp construction

Compare wheelchair ramps options side by side →

Before you sign

What to check when hiring for concrete ramp construction

All wheelchair ramps hiring checklists →

Local pros

Concrete Ramp Construction near you

Local pro matching for concrete ramp construction is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.

Related work

Often done at the same time

All wheelchair ramps services →

FAQ

Concrete Ramp Construction — questions people ask

Still have a question? Talk to our team →

It depends almost entirely on the finish, and the finish is chosen in the last few minutes of the pour. A steel-trowelled smooth surface looks excellent and is a poor outdoor ramp. A broom finish, drawn across the direction of travel, leaves a fine texture that gives grip in the rain and is what you should specify. Ice is a different matter — no finish makes concrete safe under ice, so clearing and the choice of de-icer matter as much as the finish does.
Almost certainly, somewhere — concrete shrinks as it cures and moves with temperature, and the craft is controlling where that shows rather than preventing it. Control joints cut or tooled into the slab give the cracking a planned line to follow. What you want to avoid is not hairline cracking at a joint but structural cracking with a height difference across it, because a lip on a ramp is a hazard. That kind of cracking almost always traces back to a poorly prepared or badly compacted base.
Water that gets into the surface and freezes expands, and repeated cycles can flake or pit the top layer, which is called scaling. De-icing chemicals accelerate the process by driving more freeze-thaw cycles, and some are harder on concrete than others. New concrete is most vulnerable in its first winter. Ask your contractor what they recommend for clearing your ramp and whether a sealer is appropriate in your climate — it is a question with a genuinely local answer.
Yes, but not in the way the other materials can. Removal means breaking it up — typically a machine, a jackhammer, hauling the debris away and then repairing the ground beneath. It costs real money and it makes a mess of the garden. That is the honest trade for a structure that will outlast everything else on the property and never ask for maintenance. If there is a realistic chance the ramp will be unwanted within a few years, choose something that unbolts.
Longer than most people expect, and the contractor should give you the number rather than a website. Concrete gains strength over days rather than hours, and how it is cured has a lasting effect on how well the surface holds up in later winters. Weather changes the answer significantly in both directions — very hot and very cold conditions both complicate curing. Plan the whole project around this, because it is the one part of the schedule that cannot be compressed by paying more.
That depends on your jurisdiction and on how the structure is classified, and it is worth a phone call to your building department rather than an assumption. A poured ramp is substantial construction that changes drainage and often attaches at the building, which is exactly the kind of work permitting exists for. A permitted, inspected structure is also easier to explain to a buyer, an insurer or a future inspector — and unlike a bolt-together system, this one cannot be quietly taken away if it turns out to be a problem.

Get concrete ramp construction done right.

Tell us what you need and we'll match you with vetted local wheelchair ramps pros — free.

Get matched free