Services
No services match that search.
Browse by type
ChecklistsCompared honestlyWhat everything costsDecision guidesQuestions & answersPlain-English glossaryGuides & how-tosSomething wrong at home?Research & dataCalculators & tools BlogMore
Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523Taking a tub out and putting a shower in is one of the most-sold jobs in remodelling, which is why almost everything written about it is written by someone with a product to install. What decides the price is the drain, the substrate and how much of the wall comes off.
A tub to shower conversion removes a bathtub and builds a shower in the same alcove. Because the two fixtures use the space differently, the job almost always involves moving or reworking the drain, replacing the valve, and rebuilding the walls of the alcove — the tub does not simply lift out and a shower drop in. How much of that work is done, versus covered over, is the difference between a two-day job and a two-week one, and it is the question every quote should answer.
Seeing something not on this list? Browse bathroom remodeling problems by symptom →
Establish what happens to the drain
A bathtub drains at one end through a waste and overflow assembly; a shower drains through a centre or linear drain in a floor built to fall toward it. Those are rarely in the same place, so most conversions involve opening the floor to move or extend the drain. Where the floor can be accessed from below it is straightforward; on a slab it means cutting concrete.
Watch for: A quote that never mentions the drain. Either they have found a base whose outlet lines up — worth confirming — or they have not looked, and the number will change once the floor is open.
Decide prefab base or tiled pan, because everything follows from it
A one-piece acrylic or solid-surface base is fast, factory-formed to fall correctly, and has no grout. A tiled pan is built on site over a waterproofed, sloped bed and can be any size or shape, including curbless. The base decides the timeline, the price and how much of the job is craft versus assembly.
Watch for: A tiled pan quoted at prefab prices. Building a shower floor by hand and waterproofing it properly is skilled work, and a suspiciously cheap tiled pan usually means the waterproofing is where the saving came from.
Strip the alcove back and look at the walls
The tub, its surround and the wall covering come out. In older bathrooms this is where soft or blackened substrate around the tub flange appears, along with any framing damage under the old waste. Everything found here has to be dealt with before the new shower goes in.
Watch for: A crew willing to install straight onto whatever they find. If the reason you are converting is that water has been getting in, the substrate is the thing that must be replaced, not covered.
Rework the plumbing — the valve, not just the pipe
A tub-and-shower valve has a diverter and a tub spout outlet; a shower-only valve does not. The valve typically gets replaced and reset at shower height, and this is the moment to fit a pressure-balancing or thermostatic valve if the existing one is not one. Adding a handheld on a slide bar is far cheaper now than later.
Watch for: The old valve reused with the tub outlet capped off inside the wall. It works, and it leaves a capped fitting buried behind new tile forever. Ask what is being left in the wall.
Waterproof, then build the enclosure
Backer board goes up, the wet area gets a continuous waterproofing layer, the base or the sloped pan is set and tested, and the wall covering — tile or panel — goes on. On a tiled installation the membrane, the corners and the drain detail are the whole job; on a panel system the joints and the base flange are.
Watch for: Shower walls left at tub height. A shower wets the wall far higher than a bath does, and stopping the waterproofing or the tile where the old surround stopped is a defect you will discover as a stain on the other side of the wall.
Glass, screen or curtain
A fixed glass panel with an open entry is the common answer and needs no track to clean. A hinged or sliding enclosure contains water better in a small alcove. A curtain costs almost nothing and is easier to move around. Frameless glass is measured after the walls are finished, so it arrives a couple of weeks behind everything else.
Watch for: The lead time on custom glass being left out of the schedule. It is the single most common reason a "finished" shower stays unusable for another fortnight.
Make good the room around the alcove
A tub is longer and taller than most shower bases, so removing it exposes floor and wall the tub used to hide. Floor tile may need patching, the skirting line changes, and the wall above the old surround usually needs making good and painting.
Watch for: This work not appearing in the quote at all. It is genuinely easy to overlook at the walkthrough and it is genuinely not free.
Tub to shower conversions commonly run between $4,000 and $15,000. A prefab base into an existing alcove with the drain reused sits at the bottom; a tiled pan, a relocated drain, and frameless glass push toward and past the top. The drain and the base type move the number more than the tile does.
See the full tub to shower conversion cost guide — by material, size and region →
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
The comparison to read before you get quotes — including what you give up.
Acrylic, solid surface, tile and glass, by where each one belongs.
What fits in the alcove you have, and where the entry ends up.
If the driver is mobility, start here rather than with a product.
Is the drain being moved, and is that in this price?
The item most likely to turn a fixed price into a variation. If they intend to reuse the existing drain position, ask them to confirm the base they have specified actually outlets there.
Prefab base or site-built tiled pan — and which are you quoting?
Two different products at two different prices, frequently compared as though they were the same job. Get the answer in writing before you line quotes up against each other.
How high does the tile and the waterproofing go?
A shower wets the wall much higher than a tub does. Stopping at the old surround line is a common shortcut with a slow, expensive consequence.
Is the valve being replaced, and is it pressure-balancing or thermostatic?
A tub valve and a shower valve are not the same fitting. Replacing it is the moment to solve scalding when someone flushes, and it is very cheap now versus later.
What are you doing with the floor and wall the tub was covering?
Removing a tub exposes surfaces nobody has seen. Making good is real work, it is easy to leave out of a walkthrough quote, and it is awkward to argue about afterwards.
If there is water damage behind the surround, what happens?
Especially important with fast-install systems, whose speed depends on not opening things up. Agree in advance whether the job pauses and is repriced, or proceeds regardless.
When does the glass get measured and how long does it take to arrive?
Custom glass is measured after the walls are finished. Knowing the lead time up front is the difference between a planned wait and an unpleasant surprise.
Local pro matching for tub to shower conversion is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Tell us what you need and we'll match you with vetted local bathroom remodeling pros — free.
Free · No pressure · Licensed & insured pros