Services
No services match that search.
Browse by type
ChecklistsCompared honestlyWhat everything costsDecision guidesQuestions & answersPlain-English glossaryGuides & how-tosSomething wrong at home?Research & dataCalculators & tools BlogMore
Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523The boxes are the easy part. Level, plumb, scribed to walls that are none of those things — that is the job. We match you with vetted local installers and tell you when new cabinets are not what you need.
Cabinet installation is the process of setting and securing cabinet boxes to walls that are almost never square, level or plumb, and then making the result look as though they were. On a typical kitchen it takes two to four days once the boxes are on site. The visible quality of the finished job comes almost entirely from three things: an accurate field measure before the order was placed, a level reference line, and how the fillers and scribes are cut where the run meets a wall.
Seeing something not on this list? Browse cabinets problems by symptom →
Field measure the room, after demolition where possible
A field measure records wall lengths, ceiling heights at several points, window and door positions, and where the plumbing, gas and electrical actually come through. It is done with a level and a laser, not a tape alone, because what is being recorded is how far out of true the room is.
Watch for: A measure taken over existing cabinets or before demolition. Walls behind old cabinets are frequently not the walls the designer drew, and every error found later becomes a filler.
Confirm the plan against the appliances and the plumbing
Appliance specifications set opening widths, heights and clearances, and every one of those is a hard constraint. The sink base has to accommodate the actual drain position; the range needs its stated clearance to the wall cabinet above.
Watch for: A layout drawn before the appliances were chosen. A range hood or a counter-depth refrigerator specified late is one of the most expensive changes possible once boxes are ordered.
Inspect and prepare the room
Walls are checked for plumb and for high spots, studs are located and marked, and the floor is checked for level across the whole run. Any wall repair, blocking or electrical relocation happens now, while everything is accessible.
Watch for: Installation over flooring that has not been decided. Whether flooring runs under the cabinets or stops at the toe kick affects height, dishwasher clearance and future replacement — decide it deliberately, not by whoever turns up first.
Establish a level line and find the high point of the floor
The whole installation references one level line drawn around the room from the highest point of the floor. Everything — base cabinet height, wall cabinet height, the gap under the toe kick — derives from it. Get this wrong and nothing later can rescue it.
Watch for: Base cabinets set to the floor rather than to a line. Floors slope; a run that follows the floor produces a countertop that visibly falls, and it cannot be corrected once the tops are templated.
Hang the wall cabinets first
Uppers go up before the bases, so the installer is not working over them. They are joined to each other face frame to face frame, clamped and aligned so the fronts sit in one plane, then screwed through the hanging rail into studs.
Watch for: Cabinets fastened through the back panel rather than through a hanging rail into a stud. Loaded wall cabinets are heavy, and this is the failure that ends with a run on the countertop.
Set and shim the base cabinets to the line
Bases are levelled front to back and side to side with shims, joined to one another, and fastened back to the wall. Corners are set first because everything runs away from them. The tops must be a single continuous plane for the countertop to sit correctly.
Watch for: Shims left proud, or a base run that is level along its length but rocking front to back. A countertop fabricator templating over an unlevel base run will tell you — at the point where it costs a week.
Scribe fillers, panels and toe kicks to the walls
This is where the job either looks built-in or looks delivered. Fillers between the run and the wall are scribed — cut to follow the wall's actual contour — rather than left with a tapering gap covered by caulk. End panels, light rail and toe kick are cut the same way.
Watch for: A wedge of caulk filling a gap that widens toward the ceiling. It is the single clearest sign of a rushed installation, and it is the detail most homeowners notice for years afterwards.
Hang doors, fit drawers and adjust everything
Doors are hung and then adjusted at the hinge in three directions until the reveals — the gaps between doors — are even across the whole run. Drawer fronts are set to match. Hardware is fitted last, to a jig so the spacing is identical.
Watch for: Doors left as hung. Every European hinge is adjustable and a run that is not adjusted shows uneven gaps that catch the eye immediately. Ask specifically that reveals be set before final payment.
Cabinet installation labour is usually priced per cabinet or per linear foot and is separate from the cabinets themselves. Demolition, disposal, filler and panel work, and any wall or electrical alterations are typically extra. The cabinets cost guide breaks out labour against the boxes and against refacing.
See the full cabinet installation cost guide — by material, size and region →
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
The buying decision behind every cabinet order — lead time, sizing increments and what can be changed.
Plywood, solid wood, MDF and particleboard age very differently, particularly at the sink base.
Corners, islands, tall runs and upper-to-lower balance, decided before anything is ordered.
Who takes the field measure, and are they liable if the order does not fit?
The most important commercial question on the job. Measurement liability sits with the supplier, the designer or you, and it is often unclear until something is wrong.
Is the price per cabinet, per linear foot, or a day rate?
Determines what happens when the job grows. A per-cabinet price with a separate filler and panel allowance is the most transparent structure.
Are fillers, end panels, light rail and toe kick included?
This is the trim work that makes the run look built in. It is also the standard exclusion, and it is a meaningful amount of skilled labour.
Does the flooring go under the cabinets or up to them?
Affects cabinet height, dishwasher clearance and what happens the next time the floor is replaced. Get it decided before the level line is drawn.
Who is responsible if a box arrives damaged or wrong?
Damaged and misordered items are routine. The question is whether the installer manages the replacement or downs tools while you deal with the supplier.
Is demolition and disposal of the old cabinets included?
A full kitchen produces a surprising volume of waste, and skip hire and haulage are commonly excluded from an attractive-looking quote.
Will door reveals be adjusted before you consider the job complete?
Hinge adjustment is the last hour of work and the first thing a visitor notices. Making it an explicit deliverable is the easiest quality control you have.
Local pro matching for cabinet installation is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Tell us what you need and we'll match you with vetted local cabinets pros — free.
Free · No pressure · Licensed & insured pros