Services
No services match that search.
Browse by type
ChecklistsCompared honestlyWhat everything costsDecision guidesQuestions & answersPlain-English glossaryGuides & how-tosSomething wrong at home?Research & dataCalculators & tools BlogMore
Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523On a commercial site the hydraulics are the easy part. What decides the project is metering, cross-connection compliance, central control across zones nobody visits daily, and who is accountable when the bill arrives.
Commercial irrigation covers systems on properties where somebody is accountable for the water budget: HOAs and multifamily, offices and retail, campuses, municipal grounds and sports fields. The engineering fundamentals are the same as residential — flow, pressure, zoning, uniformity — but the decisions that go wrong are procurement decisions: unclear metering, an under-specified control platform, and a maintenance contract that does not say who owns which failure.
Seeing something not on this list? Browse irrigation problems by symptom →
Establish the water budget and how it will be measured
Before design, agree what the site should use and how that will be evidenced — a dedicated irrigation meter, submeters per area, or flow sensors reporting into the control platform. A number nobody can measure is a target nobody can be held to.
Watch for: Landscape water billed on a combined domestic meter. It makes performance invisible, and it can also mean paying sewer charges on water that never entered a drain. Ask the utility whether a separate irrigation meter is available.
Survey, phase and plan around an occupied site
Commercial installations rarely happen on a clear site. Trenching routes, parking closures, working hours, tenant and resident notice, and traffic management all belong in the plan rather than in a change order.
Watch for: A programme with no phasing. On an occupied site the constraint is access, not digging speed, and a contractor who has not planned around that will discover it at your cost.
Design to a stated uniformity and flow standard
The specification should name the design pressure at the head, the target application uniformity, and the flow budget per zone — so that what was delivered can be verified rather than argued about.
Watch for: A bid that quotes head counts and zone counts but no performance criteria. Without them there is nothing to hold the installer to at handover.
Cross-connection protection to the utility's commercial standard
Commercial connections commonly attract stricter backflow requirements than residential ones, and sites with fertiliser or chemical injection are treated as a higher hazard again. Device type, enclosure, testing interval and tester certification are set by the water purveyor.
Watch for: Backflow treated as a line item rather than a compliance obligation with recurring testing. On a commercial account the testing paperwork is an ongoing duty, and it needs a named owner in the maintenance contract.
Central control, flow sensing and alerting
The operational case for a commercial platform is not convenience — it is the flow sensor and master valve combination that detects an abnormal flow and shuts the affected zone down automatically, rather than letting a broken lateral run all weekend.
Watch for: A control platform specified without flow sensors. Remote scheduling is the smaller half of the value; automatic shutdown on a break is what pays for the system.
Hydrozoning to match how the site is actually used
Zones are separated by exposure, plant type and use — high-traffic turf, ornamental beds, screening planting, and any area scheduled for conversion to lower-water landscape. Separating them now is what allows selective reduction under a drought stage later.
Watch for: Amenity turf and low-water planting sharing a valve. Under an allocation you will have no way to cut one without killing the other.
Overspray, drainage and public-safety detail
Heads adjacent to walkways, entrances and roads need arcs and nozzles chosen so water does not land on pavement, both because it is wasted and because wet paving is a slip and, in freezing climates, an ice hazard.
Watch for: Perimeter heads set to full circle for convenience. It is the most common defect on commercial sites and the one most likely to appear in an incident report.
Handover: as-builts, commissioning data and a service contract
You should receive as-built drawings, a zone schedule, commissioning measurements, controller credentials in the organisation's name, and a maintenance agreement that names response times and defines the boundary between warranty and billable work.
Watch for: Control platform accounts registered to the contractor. On a commercial site this becomes a genuine handover problem at the next tender, and it should be a condition of final payment.
Commercial pricing is driven by acreage, zone count, controller platform and site access constraints far more than by head count — and phasing around an occupied property is often the largest single variable. Ask for it broken out by phase. See the Cost Guide.
See the full commercial irrigation installation cost guide — by material, size and region →
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
Multi-site scheduling, flow sensing and alerting — the specification that separates commercial from residential control.
Commercial connections commonly attract stricter requirements than residential ones.
Governance, cost allocation and common-area responsibility.
The standard first step on an existing commercial site before any capital request.
What commercial sites of this type have you delivered, and can I speak to the facilities contact?
Residential competence does not transfer automatically. Phasing around occupied property and working to a specification are different skills from installing on a bare residential lot.
What design pressure, uniformity target and flow budget will you design to?
These are the criteria that make the finished system verifiable. Get them into the contract, not just the conversation.
Are flow sensors and a master valve included, and what happens on an abnormal flow?
Automatic shutdown on a break is the feature that most often justifies the control platform on a commercial budget.
Who holds the backflow testing obligation after handover, and how is it evidenced?
Commercial accounts carry recurring compliance. If the maintenance contract does not name the owner, nobody owns it.
Will the control platform accounts be registered to us?
Make it a condition of final payment. Recovering platform access from a departed contractor is a slow and avoidable problem.
What certifications does your design and field staff hold?
The Irrigation Association runs recognised programmes including Certified Irrigation Designer, Certified Irrigation Contractor and Certified Irrigation Technician. On a specified commercial job these are a reasonable prequalification requirement.
What are the response times in the maintenance agreement, and what is excluded?
A break on a commercial site runs at commercial volumes. Response time is the number that limits your exposure.
How will you phase the work around occupancy?
The answer tells you whether they have run a project like yours. Vague phasing plans become change orders and tenant complaints.
Local pro matching for commercial irrigation installation is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Still have a question? Talk to our team →
Tell us the scope and we'll route it to vetted commercial irrigation contractors — free.
Free · Licensed, insured & bonded contractors