HomeMatchup
Roofing · Checklists

Roofing checklists

Use four checklists: a quote checklist (square count, tear-off, underlayment, flashing, ventilation, disposal, permit), a contractor checklist (insurance, local address, written contract, staged payments), a twice-yearly inspection checklist, and a post-storm documentation checklist.

The quote checklist saves the most money because it makes bids comparable. Fixr puts labor at 40-60% of the total and tear-off at $50-$150 per square, so a bid that omits tear-off can look 15-20% cheaper while covering less work.

The post-storm checklist is about evidence. Photograph everything before any temporary repair, keep receipts for tarps and emergency work, and do not authorize any repair on the basis of a stranger's inspection. Never accept an offer to waive your deductible - the Texas Department of Insurance calls this illegal and warns it can be fraud.

The maintenance checklist is short and boring: clear gutters, check flashing and sealant at penetrations, look for lifted or missing shingles after high wind, and check the attic for daylight, staining and damp insulation.

Checklist 1

The quote checklist: 14 lines that make two bids comparable

Most roofing quotes are not comparable because they describe different amounts of work. This is the list that fixes that.

The single most expensive mistake in a re-roof is comparing a $14,000 bid with an $18,000 bid as though they cover the same job. They usually do not. One includes tear-off of two layers, new flashing at every penetration and ventilation correction; the other assumes a layover, reuses the existing chimney flashing, and leaves the permit to you. The price difference is not a discount, it is a scope difference.

The fix is procedural. Send every bidder the same written scope, ask each to price the same list, and reject any quote that leaves a line blank. Verisk's data puts the average residential roof replacement at $17,631 in 2025 - that is enough money to justify an afternoon spent making the paperwork honest.

Work through the list below with each quote in front of you. Every item should appear as a line, with a number, a product name, or an explicit "not included". If a contractor resists putting the roof square count in writing, that alone is enough to walk. Our guide to what a roofing square is explains why that number governs everything else, and the roofing squares calculator lets you sanity-check the figure yourself before anyone quotes.

  • 1. Roof square count. The measured area in squares (100 sq ft each), plus pitch. Everything else prices off this. Two bids with different square counts are describing different roofs.
  • 2. Number of existing layers. How many are there, and how many are being removed? A layover over one existing layer is a different job from a full tear-off to deck.
  • 3. Tear-off and disposal. Named as a line, including skip or dumpster and tipping fees. Omitting it can make a bid look materially cheaper while covering less work.
  • 4. Deck inspection and repair allowance. A per-sheet price for replacing rotten decking, agreed in advance. Without it, deck rot becomes an open-ended change order mid-job.
  • 5. Underlayment, by product. Felt weight or the specific synthetic. "Underlayment" alone is not a specification. See the underlayment guide.
  • 6. Ice-and-water shield locations. Eaves, valleys, around penetrations - and how far up from the eave. In cold climates this is where leaks are bought or prevented.
  • 7. Drip edge. Included, and at both eaves and rakes. It is cheap and it is routinely omitted.
  • 8. New flashing at every penetration. Chimney, skylights, vent stacks, walls, valleys. Reusing old flashing is the most common hidden downgrade in a low bid.
  • 9. Ventilation work. What intake and exhaust is being installed, with net free area figures. A new roof over an under-ventilated attic is a new roof that ages early.
  • 10. Named shingle product and color. Manufacturer, product line, and color - not just "architectural shingle".
  • 11. Starter strip and ridge cap. Manufactured components rather than cut-up field shingles. Many manufacturer system coverages depend on this.
  • 12. Permit responsibility. Who pulls it, in whose name, and whether the fee is in the price. Requirements are local - ask your building department what applies to you.
  • 13. Warranty terms, in writing. The manufacturer's material terms and the contractor's own workmanship period, stated separately. Read roofing warranties explained before you interpret either.
  • 14. Payment schedule and completion terms. Milestone-based, with a final payment released only after the work is done and inspected.
Checklist 2

The hiring checklist: verifying a roofer before you sign

Nine verifications, all of which you can complete in an afternoon, most of them for free.

Roofing attracts transient operators for a structural reason: the work follows storms, the demand is urgent, and the customer usually cannot inspect the finished product. The FTC's warning signs for home improvement scams read like a description of the post-storm doorstep pitch - claiming no licence is needed, offering a discount only if you sign immediately, asking you to sign over the insurance cheque, and demanding payment up front.

Verification is not adversarial and a good contractor expects it. What separates the two groups is how they react to being asked. A local firm with a real address sends you certificates without comment. An operator who has been in your area for six days finds reasons why the paperwork is coming later.

Two specifics carry more weight than the rest. First, insist that certificates of general liability and workers' compensation come to you directly from the insurer or broker, not as a PDF forwarded by the contractor - forged certificates are common and easy. Second, ask them to pull the permit in their own name where a permit is required. A contractor who wants the homeowner to pull it is moving the code liability onto you.

Full walkthrough in how to hire a roofer, and the fraud patterns in how to spot a roofing scam.

  • 1. Licence. Verify it with your state or county directly, not by looking at a card. The FTC's guidance is explicit that you should check with the licensing authority yourself. Requirements vary by state - some do not licence roofers at all, which makes the remaining checks matter more.
  • 2. Physical local address. A verifiable street address you can visit, not a mailbox service or a truck. Check it on a map before you call.
  • 3. Insurance certificates, sent by the insurer. General liability and workers' compensation, current dates, your name as certificate holder. Request them from the broker directly.
  • 4. Local references from the last 12 months. Ask for addresses in your area, then drive past. Recent local work is harder to fake than a review page.
  • 5. Manufacturer certification, if a system warranty is being promised. Verify the credential on the manufacturer's own contractor lookup, not the contractor's website.
  • 6. Written, itemized contract. Scope matching the quote checklist above, start and completion dates, change-order procedure, and cleanup and nail-sweep obligations.
  • 7. Sane payment terms. A modest mobilization payment is normal. A large majority of the contract price up front is not. Pay by cheque or credit card - the FTC warns specifically against wire transfer, gift cards, payment apps, cryptocurrency and cash, because those are near-impossible to claw back.
  • 8. Permit in the contractor's name. Ask directly. Reluctance here is a signal about licensing status.
  • 9. No pressure. A same-day-only discount, an inspection you did not ask for, or an offer to "cover your deductible" are all reasons to end the conversation. The Texas Department of Insurance describes deductible-waiving as illegal and warns it can be fraud.
Checklist 3

The pre-project checklist: the week before the crew arrives

A re-roof is a demolition job happening above your head. Twenty minutes of preparation prevents most of the annoyances.

Nobody warns homeowners how physical a tear-off is. Debris rains off the eaves, the noise is constant, and vibration travels through the structure into every room below. Most of the complaints that follow a re-roof are not about the roof at all - they are about a cracked patio slab, a picture that fell off a wall, or a car with a nail in the tyre.

Work through this the week before, not the morning of. Confirm the dates in writing, then confirm again two days out; weather moves roofing schedules constantly and crews sometimes arrive earlier than you expect. Our walkthrough of the roof replacement process covers what each day actually looks like.

  • Confirm dates and hours in writing - including the weather-delay policy and how you will be told about a change.
  • Agree the dumpster and materials location - and check what it will sit on. Driveways crack under loaded dumpsters; ask for plywood protection.
  • Move vehicles well clear and keep them clear for the whole job, not just day one. Nails travel.
  • Take before photos of the driveway, patio, landscaping, siding, gutters and interior ceilings. Dated photos settle damage disputes in minutes.
  • Clear the attic of anything stored directly under the deck, and cover what stays. Tear-off drops decades of debris through the sheathing gaps.
  • Take pictures and mirrors off the walls on the upper floor, and anything on open shelving. Vibration is severe.
  • Cover items in the garage if it is attached and unfinished - dust falls through the ceiling framing.
  • Plan for pets and small children to be elsewhere on tear-off day. It is loud, and there is falling material.
  • Cut back or tie up shrubs at the drip line, and agree what protection the crew will lay over planting beds.
  • Confirm power and water access for the crew, and where they will site the compressor.
  • Agree the daily cleanup standard and a final magnetic nail sweep of the lawn and driveway, written into the contract.
  • Ask about satellite dishes and solar - who removes and refits them, and who is responsible if the signal or system does not come back.
Checklist 4

The twice-yearly inspection checklist you can run from the ground

Spring and fall, in that order of priority, all of it done safely from a lawn, a ladder edge and an attic.

The National Roofing Contractors Association recommends inspecting at least twice per year, spring and fall, plus after severe weather. That cadence exists because it brackets the two seasons that do the damage: freeze-thaw and wind in winter, heat and UV in summer.

The safety rule comes first and does not bend. Stay off the roof. A ladder at the eave, binoculars from the ground, and a torch in the attic will find nearly everything a homeowner needs to find, without the fall risk and without scuffing granules off warm shingles. Anything that needs a closer look is worth an inspection - Angi puts the national average at about $250, within a $75-$1,100 range depending on size, pitch and access.

Run it in the same order every time and write down what you find. The value of a maintenance log is comparison: "the same three lifted tabs as last spring" is a different situation from "three new lifted tabs". Keep the dated photos with the log. More detail in the roof maintenance guide and the maintenance checklist.

  • Ground survey, each elevation. Missing, lifted, curled or cracked shingles. Dark patches where granules have gone. Any area that reads flatter or shinier than its neighbors.
  • Roof line. Sight along the ridge and eaves. Any sag, dip or wave is structural and stops the checklist - call a professional.
  • Ridge and hips. Cracked or displaced ridge caps; damaged ridge vent. Wind attacks the ridge first.
  • Flashing at every penetration. Chimney, skylights, vent stacks, wall junctions, valleys. Look for rust, lifted metal, cracked or shrunken sealant, missing counterflashing.
  • Valleys. Debris packed into the channel; any exposed or damaged valley metal.
  • Gutters and downspouts. Clear of debris; no sagging spans or separated joints; outlets flowing; downspouts discharging away from the foundation.
  • Granules. Check the gutter bottoms and downspout splash blocks. Heavy accumulation on a roof under ten years old warrants a professional opinion.
  • Fascia, soffit and drip edge. Staining, softness, peeling paint, gaps. Blocked soffit vents.
  • Trees. Branches touching or overhanging the roof plane. Abrasion and debris are both preventable here.
  • Attic, lights off. Daylight through the deck; dark tide marks or staining on the sheathing; rusted nail shanks; damp, matted or discolored insulation; mold; any smell of damp.
  • Attic ductwork. Every bathroom and kitchen exhaust fan terminating outside the building, not into the attic.
  • Ceilings and upper walls indoors. New stains, bubbling paint, or a stain that has grown since last time.
  • Log it. Date, findings, photos, actions taken, and who you called.
Checklist 5

The post-storm checklist: documentation before repair

The order of operations matters more than the speed. Document first, mitigate second, decide third.

Roof damage is a large share of what property insurance pays for. Verisk found roofing line items make up roughly 30 percent of all line items in claims estimates, and in 2025 sixteen US states had 20 percent or more of their roofs impacted by severe hail. If you own a house in a hail or wind state, a post-storm claim conversation is a matter of when.

That conversation goes on the evidence you gathered in the first 48 hours. Photographs taken before any tarp goes up, receipts for every emergency expense, and a written timeline are worth more than any argument you make later. So is the boring detail: photograph the whole elevation for context as well as the close-ups, because an adjuster needs to place the damage on the building.

The second thing that matters is who you let onto the property. Post-storm neighborhoods fill with operators who did not live there the week before. The FTC's advice is direct - do not sign anything under pressure, do not sign over your insurance cheque, and verify the licence with your state or county before anyone starts. And the Texas Department of Insurance is clear that a contractor offering to waive or absorb your deductible is describing something illegal that can amount to fraud.

Then read storm damage: what to do and how to file a roof insurance claim before you make the call, so you know what your policy actually requires of you.

  • 1. Stay off the roof. Storm-damaged decking can be unsound and wet. Nothing on this list requires you to be up there.
  • 2. Check the interior first. Ceilings, upper walls, and the attic. Active water entry is the thing that needs mitigating today.
  • 3. Photograph before you touch anything. Wide shots of every elevation for context, then close-ups of specific damage, then all interior damage. Video the whole exterior as one continuous walk-round.
  • 4. Record the event. Date, time, and what the weather did - wind, hail size, duration. Save any local weather report or alert.
  • 5. Look at the ground, gutters and soft metal. Shingle fragments in beds, granule piles at downspouts, and dents in gutters, vents, downspouts or air-conditioner fins. Soft metal is the standard hail evidence.
  • 6. Mitigate reasonably, and only reasonably. Most policies require you to prevent further damage. A tarp and buckets qualify; a full repair before the adjuster has seen it does not.
  • 7. Photograph the temporary repairs before and after, so nobody mistakes your tarp for pre-existing work.
  • 8. Keep every receipt. Tarps, emergency labor, a hotel night if the house is unliveable. Put them in one folder with the photos.
  • 9. Call your own insurer. Report it yourself, get a claim number, and write down the name of everyone you speak to and the date.
  • 10. Choose your own contractor. Do not act on a stranger's unsolicited inspection, do not sign a contract to "hold your place in line", and never sign over the insurance payment.
  • 11. Be present for the adjuster's visit and give them your photo set and timeline. Ask for a copy of their scope and estimate.
  • 12. Get an independent quote against the same scope, and raise anything the adjuster's estimate has missed in writing rather than by phone.
Checklist 6

The document pack: what to keep and for how long

Roof paperwork has three audiences - your insurer, your warranty provider, and the person who eventually buys your house.

This is the checklist people skip and later regret. A material warranty you cannot evidence is a warranty you do not have. An insurance claim on a roof whose age you cannot prove is a harder claim. A buyer's inspector who asks about the re-roof and gets a shrug is a buyer negotiating the price down.

Keep it as one folder, ideally digital and backed up somewhere that is not inside the house. The Insurance Information Institute makes the same point about home inventories generally: store a copy outside the property, because the event that triggers the claim can also destroy the records.

Registration deadlines are the trap worth flagging. Some manufacturer coverages require registration within a set window after installation, and the terms vary by manufacturer and product. Find yours and diarise it the week the job finishes rather than discovering the deadline years later.

DocumentWhy it mattersKeep for
Signed contract and all change ordersDefines what was actually bought if a dispute arisesLife of the roof
Final invoice and proof of paymentEstablishes completion date and cost basisLife of the roof, plus tax records
Permit and passed inspection recordBuyers and insurers both ask; unpermitted work complicates a saleLife of the roof
Manufacturer warranty and registration confirmationCoverage frequently depends on timely registrationFull warranty term
Contractor workmanship warrantyThe document that covers installation defects, separate from materialsFull stated term
Product documentation for shingles, underlayment, ventilationNeeded to match repairs and to interpret cleaning and coating restrictionsLife of the roof
Before, during and after photosSettles damage disputes and evidences roof age and conditionLife of the roof
Maintenance and inspection logDemonstrates upkeep if a manufacturer claim is questionedLife of the roof
Storm claim file: photos, receipts, adjuster scope, correspondenceSupports supplements, appeals, and any later related claimAt least the policy limitation period

Store a copy off-site or in the cloud - the Insurance Information Institute recommends keeping property records somewhere other than the property itself.

Stop signs

Checklist red flags: eight moments to stop the conversation

Every item here is a reason to end a meeting, not to negotiate harder.

Checklists work by catching what you would otherwise talk yourself past. These eight are the ones that cost homeowners the most money, and they share a shape: each one asks you to give up either information, leverage, or money before the work exists.

None of them require you to be rude. "I don't sign anything the same day" is a complete sentence, and any legitimate contractor has heard it a hundred times. The operators who cannot survive that sentence are exactly the ones you are filtering for.

If a pitch fails on any of these, the correct response is to stop, and - if it looks like fraud rather than sloppiness - report it. The FTC takes reports at ReportFraud.ftc.gov, and your state insurance department handles the deductible and claim-related ones.

  • An unsolicited inspection turns up damage you cannot see. Get a second opinion from a firm you contacted first. Uninvited damage findings are the classic post-storm opening.
  • A discount that only exists today. Manufactured urgency exists to stop you comparing bids. The FTC lists sign-today discounts among its scam warning signs.
  • An offer to waive, absorb or "work around" your deductible. The Texas Department of Insurance calls this illegal and warns it can be fraud. Walk, then report it.
  • A request to sign over the insurance cheque, or an "assignment of benefits" you did not ask for and have not read. You are handing over control of your own claim.
  • Payment demanded by wire, gift card, payment app, cryptocurrency or cash. The FTC names all five; they are chosen because the money cannot be recovered.
  • Insurance certificates that come from the contractor rather than the insurer. Ask the broker to send them directly. Forged certificates are easy to produce.
  • Reluctance to pull the permit in their own name, or a claim that no permit is needed without checking. Confirm with your building department yourself - rules are local.
  • No written scope, no square count, no product names. A verbal quote is not a quote. If it will not go on paper, it will not be built.
How to choose

Choosing roofing checklists

The judgement calls that decide the bill, before anyone quotes you.

  • Quote checklist Roof square count; number of existing layers to remove; disposal; underlayment type; ice-and-water shield locations; new flashing at all penetrations; ventilation work; named products; permit responsibility; payment schedule.
  • Contractor checklist Verifiable local address; general liability and workers' comp certificates sent directly by the insurer; written detailed contract; no large up-front deposit; willingness to pull the permit in their name.
  • Inspection checklist (spring and fall) Gutters clear; no lifted, cracked or missing shingles; flashing intact at chimney, valleys and walls; no sagging lines; attic dry, ventilated and free of daylight or staining.
  • Post-storm checklist Stay off the roof; photograph interior and exterior damage; keep all receipts; make only reasonable temporary repairs; contact your own insurer and your own chosen roofer.
  • Documentation to keep Contract, permit, product documentation, warranty paperwork, before/after photos and final invoice. You will need these when you sell.
FAQ

Roofing checklists - common questions

Still have a question? Talk to our team →

Twice a year - typically spring and fall - plus after any significant wind or hail event. Most of the inspection can be done safely from the ground with binoculars and from inside the attic.
Wide shots showing the whole elevation, close shots of specific damage, interior water staining, and any temporary repairs before and after. Keep every receipt for emergency work.
The roof square count. Everything else is priced off it, and it is the only way to tell whether two quotes are describing the same roof.
A modest mobilization payment is normal; a large majority of the contract price up front is not. Tie payments to milestones - materials delivered, tear-off complete, job complete and inspected.
At minimum: the roof square count and pitch, the number of existing layers and how many are being removed, tear-off and disposal, a per-sheet deck repair allowance, the underlayment product, ice-and-water shield locations, drip edge, new flashing at every penetration, ventilation work with net free area figures, the named shingle product and color, starter and ridge cap components, permit responsibility, both warranties in writing, and a milestone payment schedule. Any blank line is a scope difference hiding as a price difference.
Check the licence with your state or county directly rather than looking at a card - the FTC's guidance is explicit on this. Confirm a physical local address you can visit. Have general liability and workers' compensation certificates sent to you by the insurer or broker, not forwarded by the contractor. Ask for local references from the past year and drive past them. Verify any manufacturer certification on the manufacturer's own contractor lookup.
Wide shots of every elevation for context, close-ups of each specific damage point, all interior water staining, and the ground evidence - shingle fragments, granule piles at downspouts, and dents in gutters, vents, downspouts and air-conditioner fins. Take everything before any tarp goes up, then photograph the temporary repairs before and after. A continuous video walk-round of the exterior is a useful backup to the stills.
No. The FTC lists exactly this pattern among post-disaster scam behaviors: an unsolicited approach, damage you cannot verify, and pressure to sign immediately. Contact a contractor you found and vetted yourself, and report the claim to your own insurer directly. If anyone offers to waive or absorb your deductible, end the conversation - the Texas Department of Insurance describes that as illegal and warns it can be fraud.
A modest mobilization payment to cover material ordering is normal. A large majority of the contract price up front is not, and asking for everything in advance is one of the FTC's named warning signs. Tie payments to milestones - materials delivered, tear-off complete, job complete and inspected - and make the final payment only after the work is finished and you are satisfied with it.
The roof square count. A square is 100 square feet, and it is the unit everything else prices off - shingles, underlayment, labor, disposal. Two quotes with different square counts are describing different roofs, and no other comparison you make is valid until that number matches. Measure it yourself first with a squares calculator so you can tell whether a bidder's figure is plausible.
Move all vehicles well clear and keep them clear. Take dated photos of the driveway, patio, landscaping, siding and interior ceilings. Clear or cover anything stored in the attic, because tear-off drops debris through the deck. Remove pictures and mirrors from upper-floor walls - the vibration is severe. Agree where the dumpster sits and what protects the driveway underneath it, and plan for pets and small children to be elsewhere on tear-off day.
Twice a year, spring and fall, plus after any significant wind or hail event. That is the National Roofing Contractors Association's recommendation, and it brackets the two seasons that cause most damage. Run the same list in the same order each time and log what you find, because the useful signal is change - three new lifted tabs means something different from the same three you noted last spring.
No, and you should not be. Every item on a homeowner checklist can be run from the ground with binoculars, from a ladder set safely at the eave, and from inside the attic with a torch. Walking on shingles scuffs granules off and a fall from a roof is a serious injury. If something needs a closer look, book an inspection - Angi puts the national average at around $250, within a $75-$1,100 range.
The signed contract and every change order, the final invoice and proof of payment, the permit and passed inspection record, the manufacturer warranty plus its registration confirmation, the contractor's workmanship warranty, product documentation for shingles, underlayment and ventilation, and before, during and after photos. Keep a copy off the property - the Insurance Information Institute makes the same point about home records generally, since the event that triggers a claim can destroy them.
Ask the contractor to pull it in their own name where a permit is required. A contractor who wants the homeowner to pull it is shifting code liability onto you, and it can be a signal about their licensing status. Permit requirements are set locally and vary widely, so confirm what applies to your address with your own building department rather than relying on what any contractor tells you.

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few roofing pros whose licence and insurance we have already checked - free, no obligation.

Get matched free Back to roofing

Free · No pressure · Only your matched pros get your details

Who wrote and checked this

Written by

The HomeMatchup Content Team

Editorial
Reviewed by

Michael Thompson

Senior Home Improvement Reviewer · 20 years

Senior technical reviewer.

Team-written. Second-person reviewed. Sources dated. Report a correction.

(866) 582-8523 Get free quotes