HomeMatchup
Solar · Services

Solar services

Solar companies handle site assessment and system design, permitting with your local building department, physical installation, the utility interconnection application, commissioning, and ongoing monitoring. Separate specialists handle repairs, inverter replacement, and panel removal-and-reinstall when a roof needs work.

A normal residential job runs in this order: site assessment and roof evaluation, system design and proposal, permit application to your authority having jurisdiction, installation, local inspection, then the utility's interconnection approval and permission to operate. You do not generate credited power until that last step clears, and it is often the longest part of the schedule.

The US Department of Energy's homeowner guidance is the most neutral overview of this process and is worth reading before you take a single sales appointment — it is written by people with nothing to sell you.

Two services people forget to ask about at signing: removal and reinstall (what it costs to take panels off and put them back when you reroof) and service after the sale (who physically shows up in year eight). Get both answered in writing. If your roof has fewer than ten years left, reroof first — paying twice to move an array is a common, avoidable expense.

How to choose

Confirm who does the actual install
Many national brands subcontract. Ask for the name of the installing company and check its license and reviews, not just the brand's.
Ask about roof age up front
If your roof is near end of life, replace it before installing. Removal and reinstall later costs real money and creates a warranty finger-pointing risk.
Get the interconnection responsibility in writing
The installer should file with the utility and handle inspection corrections. Confirm that is included, not billed hourly.
Ask what monitoring costs after year one
Monitoring is often free for a period and then becomes a subscription, or dies if the installer goes out of business.
Verify licensing and insurance yourself
Contractor licensing is state-specific. Look up the license number with your state board directly rather than trusting a PDF from the sales rep.
8 pages

All solar services

FAQ

Solar services — common questions

Still have a question? Talk to our team →

The physical install on a typical home is usually a matter of days. The full timeline from contract to switched on is driven by permitting and utility interconnection, both of which vary enormously by jurisdiction and utility.
Yes, and a good installer will insist on one. Panels are designed to last decades; putting them on a roof with a few years left means paying to remove and reinstall them.
Manufacturer warranties on panels and inverters follow the equipment, but the workmanship warranty is only as good as the company that wrote it. Independent solar repair firms exist in most metros and will service orphaned systems for a fee.
Some jurisdictions allow owner-builder permits, but you still need utility interconnection approval, code-compliant electrical work, and inspection sign-off. Mistakes affect your homeowners insurance and your roof. For most people this is not a good DIY project.
Sources

Where these figures come from

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few solar pros whose licence and insurance we have already checked — free, no obligation.

Get matched free

Free · No pressure · We never sell your details

(866) 582-8523 Get my free quote