HomeMatchup
Decks · Permits

Deck permits

Most jurisdictions require a building permit for a deck, and permits typically cost $100 to $500. The exact threshold, drawing requirements and inspection schedule are set locally, so the only reliable answer comes from your city or county building department. Under the standard prescriptive deck guide, a deck should not be used or occupied until final inspection and approval.

How to find your rules, in order. Call or search your city building department first; if your address is unincorporated, call the county. Ask four questions: does this deck need a permit, what drawings do you require, what is the frost depth for footings here, and what inspections happen and when. Write down the answers and the name of the person who gave them.

What is not local. Some things are prescriptive across the widely adopted model code and are worth knowing before you talk to anyone. Footings must bear on undisturbed soil at least 12 inches below the undisturbed ground surface or below the frost line, whichever is deeper. Deck footings closer than 5 feet to an exterior house foundation wall must bear at the same elevation as the house footing. Approved corrosion-resistant flashing is required at any ledger board connection to a wood-framed wall. The ledger must be a minimum nominal 2x8.

What is local. Frost depth, setback distances from property lines, whether your deck triggers zoning review, whether a ground-level deck under a certain size is exempt, fee amounts, and whether stamped drawings are needed. None of those can be answered from a national article, including this one.

Before anyone digs, call 811. Footings must not be constructed over septic systems or leach fields, utility lines, or enclosed meters. This is free and it is the cheapest step in the entire project.

How to choose

Get the permit in the contractor's name
The party who pulls the permit carries the code responsibility. A contractor asking you to pull it as a homeowner is shifting risk onto you.
Ask the building department for your frost depth
Footing depth is 12 inches below grade or below the frost line, whichever is deeper — and only the local official can tell you what the frost line is here.
Don't accept 'nobody permits decks around here'
That's a bet on never selling the house and never having a claim. The permit is $100 to $500.
Attend the framing inspection if you can
It's the one time anybody looks at the footings, ledger and connections before they're covered up.
Keep the final approval document
A deck should not be used or occupied until final inspection and approval. That paperwork is what proves it happened.
0 pages

All decks permits

Nothing published here yet. Tell us what you need and we'll match you with a pro who can answer it properly.

FAQ

Decks permits — common questions

Still have a question? Talk to our team →

In most places, yes — decks are usually treated as an addition. Some jurisdictions exempt small, low, freestanding decks. Only your local building department can tell you, so call them before you sign a contract.
Typically $100 to $500 depending on location and project size.
At least 12 inches below the undisturbed ground surface or below the frost line, whichever is deeper, bearing on undisturbed soil. Your local building official determines the specified frost line.
You risk being ordered to open up or remove work, you may have trouble at resale, and you have no inspection record for the structural connections. The permit is a small fraction of a $9,000 to $20,000 project.
Sources

Where these figures come from

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few decks pros whose licence and insurance we have already checked — free, no obligation.

Get matched free

Free · No pressure · We never sell your details

(866) 582-8523 Get my free quote