Services
No services match that search.
Browse by type
ChecklistsCompared honestlyWhat everything costsDecision guidesQuestions & answersPlain-English glossaryGuides & how-tosSomething wrong at home?Research & dataCalculators & tools BlogMore
Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523Gunite and shotcrete build any shape, any depth, any edge. That flexibility comes with the longest schedule, the most stages to get right and a resurfacing cycle you own for life.
A concrete pool is formed in place: steel reinforcement is tied into the excavated hole, then concrete is pneumatically applied over it — sprayed dry-mix as gunite, or wet-mix as shotcrete — and cured into a monolithic shell. Because nothing is pre-made, the pool can be any shape, any depth, and can carry a vanishing edge, a raised spa, a beach entry or a diving well. The price of that is the longest build of the three constructions, more stages that must each be done right, and an interior finish that is periodically replaced for as long as you own the pool.
Seeing something not on this list? Browse pools problems by symptom →
Design, engineering and permit
Because the structure is engineered rather than bought, the plan set matters — soil conditions, slopes, retaining, and any structural feature such as a raised wall or a vanishing-edge catch basin have to be designed before anything is dug.
Watch for: A sketch instead of an engineered plan on a sloping or retained site. Concrete pools on hillsides carry real structural load, and that is engineer territory, not salesperson territory.
Excavation and rough shaping
The hole is dug to the designed profile, including benches, steps, ledges and the transition into any deep end. Concrete follows the shape of the hole, so the dig is the shape of your pool.
Watch for: Over-excavation "to be tidied up later". Extra concrete thickness costs money and the shape you approved on paper should be recognisable in the ground.
Steel — the part you can inspect and never see again
A cage of reinforcing bar is tied throughout the shell, with spacing and lap lengths from the engineered plan, held clear of the soil so concrete can flow all round it.
Watch for: This is your one and only chance to look at the reinforcement. Go and stand in the hole while the steel is exposed and photograph it. Once the concrete is on, the most important structural element of your pool is permanently invisible.
Rough plumbing and electrical bonding
Plumbing lines for skimmers, returns, main drains, spa jets and features are run and pressure-tested before shooting, and the reinforcement steel is bonded to the pool's electrical bonding grid.
Watch for: Pressure tests done casually or not documented. A leak in a line under a gunite shell is one of the worst outcomes in pool ownership — insist the test is witnessed and recorded.
Shooting the gunite or shotcrete
The concrete is applied at pressure over the steel and cut and screeded to the finished profile by a nozzle crew. This is a single continuous operation and it is skilled work.
Watch for: Rebound — the material that bounces off — being trowelled back into the shell instead of removed. It is weaker than properly placed material and it is a known shortcut. Watch how the crew handles the spoil at the bottom of the shell.
Curing
The fresh shell is kept damp for a period so the concrete gains strength properly rather than drying out. In hot or windy weather this needs active attention, not neglect.
Watch for: A crew that shoots on Friday and returns on Monday with nothing in between. Cure quality is invisible, permanent, and directly related to how long the shell lasts.
Tile, coping, deck — then the interior finish last
Waterline tile and coping are set, the deck poured, and only then is the interior finish applied — plaster, quartz aggregate or pebble — because it is the surface everything else would damage.
Watch for: Finish applied before the deck. It happens on rushed schedules and the finish takes the abuse of every subsequent trade.
Fill and the plaster start-up routine
The pool is filled without stopping, and a specific start-up routine follows — brushing, chemistry and timing that vary by finish type. New plaster is chemically active in its first weeks and reacts to how it is treated.
Watch for: No written start-up schedule handed to you. Staining, scaling and mottling from a badly managed first month are extremely common, look like defects, and are almost never covered by anyone.
Custom concrete is normally the most expensive of the three constructions to build and the only one with a scheduled resurfacing bill for as long as you own it. Shape complexity, depth, structural features and finish choice drive the number more than pool size does.
See the full concrete pool installation cost guide — by material, size and region →
Pool planning calculators → Volume, budget and operating-cost estimators.
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
Plaster, quartz and pebble as materials, with their own trade-offs.
The head-to-head, deliberately not restated here.
The fastest build, if a mould fits your yard.
The recurring job that comes with owning a concrete pool.
Who engineered this shell, and can I see the plan set with the steel schedule?
On any sloped, retained or unusual site the engineering is the pool. A builder who cannot produce a plan set is building from habit.
Can I inspect and photograph the steel before you shoot?
A builder confident in their reinforcement will welcome it. Hesitation here tells you more than any reference.
What is your curing procedure, and who is on site during it?
Cure quality permanently sets the strength of the shell and it is completely invisible afterwards. You want a named procedure, not a shrug.
Are the plumbing pressure tests documented and witnessed?
A buried leak under a monolithic shell is the most expensive failure in this build. Documentation is your only leverage later.
What happens to the price if you hit rock or groundwater?
The two most common cost escalations on a concrete build. Get the mechanism — rate, cap, or renegotiation — before signing.
Which interior finish are you quoting, and what is its expected service life here?
Plaster, quartz and pebble differ substantially in life and price. A quote that just says "interior finish" is not comparable to another quote.
Will you give me a written plaster start-up schedule at handover?
The first weeks decide how your finish looks for years, and this is the single most commonly skipped handover document in the trade.
Local pro matching for concrete pool installation is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Tell us what you need and we'll match you with vetted local pools pros — free.
Free · No pressure · Licensed & insured pros