Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523These are screwed into the ground, so the machine measures resistance as it goes. That produces a per-pier installation record — ask for it, because it is the only foundation repair evidence you can actually check afterwards.
A helical pier is a steel shaft with one or more helical plates that is rotated into the soil like a large screw until it reaches competent bearing material. Because it is driven by torque rather than pressure, the resistance recorded during installation relates to the capacity achieved — so each pier can be documented individually. That makes it well suited to lighter structures and new construction, where there is no heavy building to push against.
Seeing something not on this list? Browse foundation repair problems by symptom →
Confirm helical is the right family before choosing a brand
The method choice follows from the structure's weight, the soil profile and whether documented per-pier capacity is required. Structures light enough that a driven system would struggle for reaction are the classic case. The head-to-head with driven piers is set out on the comparison pages.
Watch for: A contractor whose recommendation matches whatever they install exclusively. Method should follow from the loads and the ground, and the reasoning should be stated in a sentence you can repeat.
Establish the loads and the target capacity per pier
Someone has to work out what each support location is actually carrying and what capacity each pier must reach. That number is the whole basis for judging the installation afterwards, because torque only means something when compared with a target.
Watch for: A proposal that specifies pier count and spacing without a target capacity anywhere. Without it there is nothing to check the installation record against, and the log becomes a page of numbers with no verdict attached.
Investigate what is under the site
Helical piers work by reaching soil capable of carrying the load through the helix plates. What that depth is, and whether it varies across the footprint, comes from soil information — a bore log, published local data, or experience on immediately adjacent sites.
Watch for: A fixed shaft length quoted for every location on the property. Bearing depth commonly varies across a single lot, and a fixed length either wastes steel or stops short.
Excavate and prepare each location
The soil is opened at each support point so the bracket can engage the footing. On a repair, the condition of the footing itself gets assessed at this point — the pier is only as useful as the concrete it will transfer load through.
Watch for: Deteriorated or undersized footings passed over silently. Attaching a bracket to crumbling concrete moves the failure point rather than removing it, and it shows up years later as a support that appears to have done nothing.
Advance the pier and record the torque
A hydraulic drive rotates the shaft into the ground. As the helix plates enter denser material the resistance rises, and that resistance is monitored throughout. Installation continues until the required resistance is achieved at an acceptable depth.
Watch for: Torque being read off a pressure gauge with no calibration and no written record. Ask how torque is being determined, whether the equipment is calibrated, and whether the readings are written down per pier as the work happens rather than reconstructed afterwards.
Transfer the load through the bracket
A bracket ties the pier to the footing or foundation wall so the structure's weight is carried by the pier instead of the original bearing soil. Whether the sequence stabilises the current position or attempts to recover elevation is a decision made before this step, not during it.
Watch for: Load transfer treated as an opportunity to improvise a lift. Elevation recovery has real consequences upstairs and should be a written decision — see foundation leveling.
Collect the as-built record
When the crew leaves you should hold two documents: a torque log listing each pier with its final resistance and installed depth, and an as-built layout showing where each pier physically is. Together they turn buried steel into something checkable.
Watch for: Being told the log is internal. It describes work performed on your property and paid for by you, and every serious installer produces one. Put the requirement in the contract rather than requesting it on the last day.
Backfill, reinstate and re-measure
Excavations are backfilled and compacted, hardscaping and planting are reinstated, and the elevation survey is repeated so there is a documented condition on completion.
Watch for: Loose backfill left to settle on its own, which produces a trench of sunken ground along the wall that directs water straight at the foundation you just paid to support.
Helical pier work is priced largely per pier, so the specified count drives the total. Depth to competent bearing, access for the equipment, and bracket type move the per-pier figure. Small projects such as a settling porch sit far below a whole-side underpinning scheme.
See the full helical pier installation cost guide — by material, size and region →
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
The head-to-head, including where each method runs out of road.
Shafts, helix configurations and bracket types described as equipment.
Used from the outset where competent bearing is deep, rather than as a repair.
Porches, sunrooms, decks and modular homes — too light to react against for driven systems.
The driven alternative, which needs the building's weight as reaction.
What target capacity is each pier designed to achieve, and who calculated it?
Without a target, torque readings cannot be judged. This question also reveals whether an engineer specified the scheme or a salesperson did.
Will I receive a torque log per pier and an as-built layout drawing?
The distinguishing deliverable of this method. Ask before signing, and have it named in the contract as a deliverable rather than a courtesy.
How is torque measured on your equipment, and when was it last calibrated?
A reading is only as good as the instrument. Indirect readings from an uncalibrated gauge are an estimate presented as a measurement.
What happens if a pier does not reach the required resistance at the expected depth?
It happens on real sites. You want to know now whether extensions are included, priced per foot, or become a change order negotiated mid-job.
What condition is my footing in at each bracket location, and will you photograph it?
The load path runs through that concrete. Photographs at the open excavation are the only chance anyone gets to see it.
Are we stabilising the current position or attempting to recover elevation?
Two different outcomes with different risks to finishes and pipework. Write down which one you are buying.
Is the warranty backed by you or by the manufacturer, and what does each cover?
Product warranties on the steel and workmanship warranties from the installer are separate promises with different survival odds. Ask which one answers the phone if the company is sold or closes.
Local pro matching for helical pier installation is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Tell us what you need and we'll match you with vetted local foundation repair pros — free.
Free · No pressure · Licensed & insured pros