Full services directory How it worksFor prosAbout Get matched Call (866) 582-8523Footings, foundation walls and structural slabs for additions, garages and outbuildings. If the house has already settled or cracked from movement, that is a different industry and a different page.
Foundation concrete is the new pour that carries a structure: excavated footings, formed foundation walls or piers, and often a slab — for additions, garages, ADUs and outbuildings. It is planned from soils, frost depth, loads and permits. It is not the same service as foundation repair, which stabilises or remediates an existing foundation that has already failed or moved.
Seeing something not on this list? Browse concrete problems by symptom →
Separate "new foundation" from "repair foundation"
Cracks, settlement, bowing walls and sinking corners on an existing house are foundation-repair problems — piers, stabilization, crack injection. New foundation concrete assumes you are building something that does not exist yet, or replacing a foundation as part of a rebuild under structural direction.
Watch for: A flatwork crew bidding "foundation concrete" to fix a settling house without geotech or structural input. Wrong trade framing.
Plans, soils and frost depth
Loads, wall heights, soil bearing and climate-driven footing depth come from design documents and local code. Surprises in poor fill or high water table change excavation and may require engineered revisions before concrete is ordered.
Watch for: Pouring to "what the neighbour has" without checking permit conditions on your lot.
Excavation, forms and steel
Footings are dug to design depth on competent material, forms set true, and reinforcement placed with proper chairs and clearances. Anchor bolts and hold-downs for the framing package are located before the pour, not drilled randomly later when possible.
Watch for: Steel lying in the mud at the bottom of the footing. Cover and placement are structural, not cosmetic.
Inspections before concrete
Most jurisdictions inspect footings and often walls before placement. Pouring without a required inspection is how people pay twice — once to pour, once to expose or replace.
Watch for: Pressure to pour Friday because the truck is cheap when the inspector has not signed. Wait.
Place, consolidate, cure
Concrete is placed, vibrated or otherwise consolidated in walls, finished as specified on slabs, and cured. Cold-weather and hot-weather practices matter more on foundation walls than on a short sidewalk because section thickness and strength timelines differ.
Watch for: Adding water on site to make the mix "easier" until strength suffers. Strength is why you poured a foundation.
Damp-proofing, drains and backfill coordination
Foundation walls that retain soil often need exterior drainage and damp-proofing or waterproofing before backfill — sometimes by other trades. Sequencing with plumbers for under-slab rough-in is part of the foundation package on many additions.
Watch for: Backfill against green walls with no drain plan. You just built a basement moisture problem.
Coordinate under-slab plumbing and electrical sleeves
Once concrete is placed, moving a mislocated sleeve is brutal. Plumbing and electrical rough-ins that pass through the foundation package need verified locations against the plans before the truck is ordered.
Watch for: Pour day surprises about a missing sewer stub or electrical conduit. Hold a coordination check the day before.
New foundation concrete is bid from plans: lineal feet of footing and wall, slab area, steel, depth, access and inspection complexity. Additions on tight lots cost more per foot than open greenfield pours. Repair of existing foundations is a separate market — do not use new-pour square-foot guesses for pier work.
See the full foundation concrete cost guide — by material, size and region →
Everyone else ranking for this is paid when you say yes. Here's when you shouldn't.
Are you bidding from stamped plans, and what happens if soil conditions differ?
Change-order rules should be clear before excavation.
What is included — dig, forms, steel, pump, finish, curing, debris?
Foundation bids hide exclusions more than almost any flatwork bid.
Who schedules inspections, and what is the pour window after approval?
Weather and inspector timing drive real calendars.
How are anchor bolts and hold-downs located?
Framers inherit mistakes poured into the wall.
Who handles damp-proofing, drain tile and backfill if required?
Often split trades — ownership prevents finger-pointing.
What concrete strength and testing, if any, are specified?
Matches plan requirements and lender expectations.
What is the plan for rain the night before a pour?
Water in the excavation is a quality issue, not a minor inconvenience.
How are as-built bolt locations documented for the framer?
Framing crews need accurate layout after forms come off.
Local pro matching for foundation concrete is rolling out by metro. Enter your ZIP and we'll match you with vetted pros in your area today.
Tell us what you need and we'll match you with vetted local concrete pros — free.
Free · No pressure · Licensed & insured pros