Solar permits

Home solar normally needs a building or electrical permit from your local authority having jurisdiction (AHJ) plus a separate interconnection approval from your electric utility. Rules, fees, and timelines are set locally and vary widely — your installer should file both, but you should verify the requirements with your own building department.

There are two separate approvals and people confuse them constantly. The permit comes from your city or county building department and covers structural and electrical code compliance, ending in a physical inspection. The interconnection agreement comes from your utility and ends in permission to operate. You should not switch the system on before both are done.

Some jurisdictions now use SolarAPP+, a free automated permitting platform developed by the National Renewable Energy Laboratory. It runs an automated code-compliance check on the submitted design and can issue a permit immediately when the project passes, instead of waiting for manual plan review. Adoption is city-by-city — the US Department of Energy maintains a page on the program and which jurisdictions use it.

We are not going to tell you what your local rules are, because they genuinely differ from one town to the next. Call your building department and ask three questions: which permits a residential rooftop PV system needs, what the fees are, and whether they accept SolarAPP+. Then ask your utility for its interconnection application and its current queue time.

How to choose

Find your AHJ before you sign
Search your city or county name plus "building department solar permit." Their published checklist tells you what your installer must produce.
Ask if your jurisdiction uses SolarAPP+
Where it is adopted, compliant projects get an instant permit rather than waiting for manual plan review.
Confirm permits and fees are in the contract price
Some contracts pass permit fees through at cost. Know which yours does.
Get the interconnection timeline from the utility, not the salesperson
Utility queues are the most common cause of a system sitting dark for weeks after installation.
Check HOA and historic-district rules separately
Several states limit an HOA's ability to block solar, but the specifics are state law. Ask your HOA for its written policy and check your state's rules.
0 pages

All solar permits

Nothing published here yet. Tell us what you need and we'll match you with a pro who can answer it properly.

FAQ

Solar permits — common questions

Still have a question? Talk to our team →

Almost always yes — typically a building and/or electrical permit from your local jurisdiction, plus a utility interconnection approval. The exact requirements are set locally, so confirm with your own building department.
A free automated solar permitting platform developed by NREL. It checks a submitted residential PV or PV-plus-storage design against code requirements and can issue a permit instantly if it passes, in jurisdictions that have adopted it.
A licensed installer normally pulls it. Be cautious if a contractor asks you to pull an owner-builder permit for work they are performing — it can shift liability to you.
It depends on your state. A number of states restrict what HOAs can prohibit, but the protections and their limits are state-specific. Get your HOA's written architectural policy and check your state statute.
Sources

Where these figures come from

You know more than the last homeowner they quoted.

That is worth something only while you are still choosing. Tell us what is going on and we will match you with a few solar pros whose licence and insurance we have already checked — free, no obligation.

Get matched free

Free · No pressure · We never sell your details

(866) 582-8523 Get my free quote